翻訳と辞書
Words near each other
・ Raichak on Ganges
・ Raichand Boral
・ Raichberg
・ Raichberg Transmitter
・ Raichin Antonov
・ Raichle Flexon
・ Raicho Hiratsuka
・ Raicho Vasilev
・ Raichur
・ Raichur (Lok Sabha constituency)
・ Raichur Airport
・ Raichur district
・ Raichur Doab
・ Raichur Fort
・ Raichur railway station
Raichur Thermal Power Station
・ Raichur-Gadwal-Kacheguda DEMU
・ Raiché Coutev Sisters
・ Raichō
・ Raicilla
・ Raicore
・ Raicovacea River
・ Raicu Ionescu-Rion
・ RAID
・ Raid
・ Raid (1991 film)
・ Raid (band)
・ Raid (boating)
・ Raid (film)
・ Raid (gaming)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Raichur Thermal Power Station : ウィキペディア英語版
Raichur Thermal Power Station

Raichur Thermal Power Station (RTPS) is a coal-fired electric power station located in the Raichur district of the state of Karnataka, India. It is operated by the Karnataka Power Corporation Limited (KPCL) and was the first thermal power plant to be set up in the state.〔(【引用サイトリンク】title=Projects of KPCL )〕 The power station was commissioned during various periods from 1985 and it accounts for about 40% of the total electricity generated in Karnataka.
==Establishment==
The project to construct the thermal power station was finalized in 1978 after an MOU was signed between KPCL and the Karnataka State Electricity Board.〔 TCE Consulting Engineers Ltd., a Tata Group company was appointed as the consultants for the project. The project involved two stages: Stage I, in which Units 1 and 2 were expected to be installed and Stage II, Units 3 and 4. Each unit was expected to have an installed capacity of 210 MW. An area of 300 hectares was allocated for the units. Unit I of the plant was completed in March 1985, with Unit II following in March 1986.〔(【引用サイトリンク】work=Online Webpage of TCE Consulting Engineers Ltd., A TATA Enterprise )
The construction of Unit III was started in 1986 and completed in March 1991 and the Unit IV was started in 1989 and completed in September 1994, thereby completing the Stage II. The total cost of Stage I of the project was Rs. 4,030,000,000 and of the Stage II was Rs. 9,830,000,000. The generators were supplied by Bharat Heavy Electricals Limited and the turbines by Kraftwerk Union AG (KWU) and Mitsubishi. In 1996, a further expansion of the plant was carried out, with an investment of Rs. 15,450,000,000.
Units 5 and 6 (each of 210 MW) were installed within three years.〔(【引用サイトリンク】work=Online webpage of KPCL )〕 Unit 7 (210 MW) which was completed within a record time of 25 months, was installed at the end of the year 2002〔 The total installed capacity of the power plant is 1,470 MW (7 x 210 MW). , Unit 8, with an installed capacity of 250 MW, is being constructed and is expected to be operational by September 2009.〔(【引用サイトリンク】work=Online webpage of KPCL )
Stage I (units 1 and 2) costing Rs. 403,00,00,000 (Rs. 403 crores or Rs. 4.03 bn) in 1986.
Stage II (units 3 and 4) costing Rs. 983,00,00,000(Rs. 983 crores or Rs. 9.83 bn) in 1994.
Stage III (units 5 and 6) costing Rs. 1545,00,00,000 (Rs. 1545 crores or Rs. 15.45 bn) in 1999.
Stage IV (unit 7) costing Rs. 613,00,00,000 (Rs. 613 crores or Rs. 6.13 bn) in 2002.
Stage IV (unit 8) costing Rs. 945,00,00,000 (Rs. 945 crores or Rs. 9.45 bn) in 2010

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Raichur Thermal Power Station」の詳細全文を読む